How To Start A Roof
Place nails in the three tab shingles about 3 4 inch 1 8 centimeters above the cutouts near where the tab meets the upper part of the shingle.
How to start a roof. You ll be able to roll out long sections at a time if you have a low pitched roof but the underlayment may slip off the eaves on steeper roofs so roll out no more than 10 ft. For example if your roof measures 10 feet 3 0 m x 10 feet 3 0 m and the slope of the roof is 12 12 giving a slope factor of 12x12 12x12 12 converts to 1 414 in decimal form you would multiply 10 x 10 x 1 414 to get the total of 141 square feet of roofing. This step by step tutorial shows how to install 3 tab roof shingles using the racking method. However most people prefer the cutout lines to be aligned so they make straight vertical lines.
If your eave is one straight length then pick an end and work to the other. Start by applying the drip edge to the eaves of your roof. Start from the top of the roof and remove the old shingles along with the flashing underlayment and vents. Tools you will need for roofing from amazon bostitch coil nailer https amzn to 2u1v8e2 shingle remover https amzn to 2fzu5wf roof snake https amzn to 2.
Lay a starting row at the bottom of the roof along the edge. Use a roofing nail 1 to tack the drip edge down one every 10 when placing two pieces of drip edge together overlap one end over the other by 1 and secure using two roofing nails one in the back. Not only are we working from the bottom of the roof we re also starting with the bottom most layer in terms of roofing components. However make sure that you do not nail into the tar strip.
Hammer down any large nails that are exposed by the removal. The asphalt roof shingles are the visible part and the first line of defense against inclement weather but what s underneath them really counts the first material installed at the eave is the drip edge. See below for a shopping list tools and steps subscr. Also place a nail 2 inches from each end of the shingle in line with the other.
Start pulling the roll across the decking using the backing making sure the material is lying as flat and as straight as possible as you pull.