Iko Roof Fast Application
Pdf share iko roof fast tm base ma.
Iko roof fast application. Adhesive lvc or an approved equivalent before the application of the iko roof fast membrane. Fasten the starter strip by nailing the roof fast 6 152 mm on center and staggered within the first few inches of the up slope edge and 12 305 mm on center on the vertical face note. For re roofing remove existing roofing material down to satisfactory deck or primed surface. Flashings part 12.
Iko recommends that the remainder of the width used to create the starter strip be used for the first run of roof fast 95 base. It s constructed of a durable reinforcing mat of non woven glass fibers that have been coated and permeated to a thickness of approximately 2 0 mm. Iko blueprint for roofing introduction. Wood concrete metal and other acceptable substrates must be primed with iko s s a m.
Iko roof fast cap is engineered to meet or exceed these critical building code specifications. Our roof fast base ma is constructed using a reinforcing mat of durable high strength non woven glass fibers that is coated and impregnated. Be sure to keep the roof fast flat on the horizontal surface to avoid buckles or voids and bend the roof fast as tightly as possible over roof edge prior to fastening on the outside face. Measurements and materials part 2.
Roof types and definitions part 1. Iko roof fast 95 base is a self adhesive product that can easily be cold applied on low slope roofs. The surface is covered with a thin poly film while the underside is sanded to prevent sticking in the roll. Iko roof fast cap when used with iko roof fast base ma is an ideal solution for new or renovated structures with a low slope roof.
It s constructed of a durable reinforcing mat of non woven glass fibers that have been coated and permeated to a thickness of approximately 2 0 mm. Low slope roof fast application part 10. Unroll and cut the roof fast 95 base to the appropriate length. It creates a multilayer roofing system that provides an optimal level of protection against leaks.
Allow extra material for rake and sloped side details and trim to exact length during application. Hips and ridges part 13. Iko roof fast tm 95 base application instructions. Roof fast base ma can only be used as the base sheet in a roof fast system.
Inspection and clean up part 14. Ventilation part 11.